03/11/2026
Join us for a trail workday this Saturday, 3/14 from 9:00am–12:30pm as we continue building a brand new trail. The Trailblazers NICA youth mountain bike team will be out there helping move the project forward, and we would love to have more volunteers join the crew.
We’ve started work on a new green-level trail called Chinkapin, located in the wooded area between the powerlines, the bike path, and 127th St. When complete, it will add about 2.3 miles of new singletrack to the system.
Parking will be in a new spot on 127th St., just east of where we previously parked under the power lines. Come out, lend a hand, and help build the trails we all get to ride.
WHAT YOU’LL NEED: Bring water and wear sturdy work clothes, gloves, safety glasses and sturdy shoes/boots; Sweat pants, tights, etc. will not likely survive trail work, wear jeans or something with similar durability.
WHAT TO EXPECT: For tools, we will mostly be using rouge hoes and pick mattocks. We have lots of tools at the park so if you don't have tools, we will have something for you to use.
Location Coordinates: 38°53'53.8"N 94°53'37.1"W