08/21/2026
THE DRIP 💧 Behind the scenes of the under-construction Cave Creek Advanced Water Purification facility.
Before it starts production, take a look at the technology and infrastructure that will soon turn highly treated water into a safe, reliable drinking source for Phoenix. The facility is expected to be complete in 2027, with water distribution slated for 2029.