02/09/2026
TALES FROM THE TENT!
A monthly round up of the ongoing work down at BPAG.
XT597.
The major news story for August has been the restoration of the aircraft's hydraulic systems to operational condition for the first time in 32 years. By tapping into the hydraulic lines and connecting a hand pump, we are now able to operate various actuators individually without the need for electrical power.
This represents a significant milestone in the restoration process, allowing us to bring movement and functionality back to systems that have remained dormant for more than three decades.
This month's work has seen the right-hand outer wing successfully spread and folded under hydraulic power, the wing-fold lock pins engaged and disengaged, and both the inboard and outboard flaps operated hydraulically. It is highly likely that this is the first time in over 30 years that the outboard leading-edge flap has moved at all.
Amazingly, despite having sat dry and inactive for all that time, none of the actuators showed any signs of leaking when hydraulic pressure was applied. This achievement has been greatly assisted by the generous donation of several litres of hydraulic fluid, for which we are extremely grateful.
Many of you will also have noticed the considerable progress being made with the aircraft's paint preparation. While perhaps the least glamorous aspect of the restoration, it is undoubtedly one of the most important, providing the foundation for a high-quality and long-lasting finish as the aircraft continues its journey back to its former glory.
XT905
Work continues stripping both cockpits, removing everything that is not part of the aircraft's structure or wiring harness. While this is a painstaking and time-consuming process, the team has made excellent progress in recent months.
The work being carried out now is laying the foundations for the next phase of the restoration, and we are hopeful that by the end of the year we will be able to begin structural repairs and start bringing the cockpits back to their former condition.
ZE360
Activity on the 360`s restoration has been relatively quiet this month, with much of the team's effort and resources focused on XT597 during the recent spell of favourable weather.