09/03/2026
The Friends of Luna Lake is funding rental fees through October, for the Pulsar 4400 Algea control equipment that has been on Luna Lake since June. With the two month rental, AZGFD will have 5 months of water quality data. At the end of October they will be removed and redeployed in April. The water this year, even with very low water levels, the water quality has been better than past years.