11/06/2026
We are looking for "In Kind" donations of any of the following items: The first Priority is the Electrical Panels. We can't proceed until we secure them.
Building of Hope Equipment/Structural Needs
Electric Panels Square D or Eaton and connecting materials $96,675
• 1200 amp 3 phase load center with 6 branch breaker spots.
• 400 amp 3 pole breaker x3
• 200 amp 3 pole breaker x1
• 100 amp 3 pole breaker x1
• 3- 400amp 42 space 3 phase panels
• 1-200amp 3 phase panel 42 space
• 1-100amp 3 phase panel 30
• space
• 1-90amp 3 pole breaker
• 4-60amp 3 pole breakers
• 4-40amp 3 pole breaker
• 3-70amp 3 pole breaker
• 4- 50amp 3 pole breaker
• 3- 30amp 3 pole breaker
• 6- 20amp 3 pole breaker
• 8- 20amp double pole breakers
• 6- 30amp double pole breakers
• 55 - 20amp single pole breakers
Refrigeration Needs $25,654
BOHN BCH0025MCACZA0200
COND UNIT 2.5HP 230/3 SCRL MT
CU BN SCRL 2.5HP MED
BOHN BEL0155AY6AMAB405
EVAP AIR DEF 115V 3FAN WOPT
EVAP A1/A2L AIR DEF 115V 3FAN
W/OPT
¬¬¬ BOHN BCH0025MCACZA0200
COND UNIT 2.5HP 230/3 SCRL MT
CU BN SCRL 2.5HP MED
BOHN BEL0155AY6AMAB405
EVAP AIR DEF 115V 3FAN WOPT
EVAP A1/A2L AIR DEF 115V 3FAN
W/OPT
BOHN BCH0055LCBCZA0300 5,829.1100 5,829.11
COND UNIT 5.5HP 230/3 SCRL LT
BOHN BEL0155BY6EEAB405 3,140.5600 3,140.56
EVAP ELEC DEF 230/1 3FAN W/OPT
EVAP A1/A2L ELEC DEF 230V 3FAN
W/OPT
HVAC $75,000
American Standard
(3) 5 Ton Split System w/ 80% Gas
Furnace
Includes installation of all new ductwork, drop ceiling registers, labor and misc. material.
Structural Framing & Wood Lumber, Drywall & Partition Wall Insulation, Suspended Ceiling Grid, Over-Grid Insulation & Lighting (12' Walls & Openings) $24,674.50
• 12' 2x6 Premium Wood Studs (Vertical walls & trimmer configurations) × 195 Pieces
• 16' 2x6 Premium Boards (Bottom plates & double top plates) × 40 Pieces
• 2x8 x 8' Framing Lumber (Standard 36" office/bathroom door headers) × 9 Pieces
• 2x12 x 10' Structural Lumber (Load-bearing exterior roll-up garage door header) × 2 Pieces
• 12' 2x6 Structural Studs (Garage door framing trim/king studs) × 4 Pieces
• Heavy-Duty Construction Hardware (Structural framing nails, anchoring bolts, hurricane ties) × 1 Block
• 10% Framing Material Waste & Lumber Delivery Surcharge × 1 Flat Fee
• 5/8" x 4' x 12' Type X Firecode Drywall Panels × 103 Sheets
• R-19 Kraft Faced 15" x 39.2' Fiberglass Insulation Rolls (For 2x6 wall cavities) × 51 Rolls
• Drywall Joint Compound (Lightweight pre-mixed 5-Gallon buckets) × 14 Buckets
• Joint Tape & Corner Bead Accessories (Premium paper tape and vinyl beads) × 1 Block
• Collated Drywall Screws (1-5/8" lengths for wood framing application) × 4 Boxes
• Drywall Freight Delivery & Jobsite Flat Placement Fee × 1 Flat Fee
• Premium 2' x 4' Acoustic Ceiling Tiles (Fissured mineral fiber, 32 sq. ft. per case) × 192 Cases —
• Over-Grid R-19 Unfaced Insulation Batts (24" width for suspended systems) × 64 Rolls
• 2' x 4' Integrated LED Flat Panels (Commercial multi-voltage 120-277V, selectable wattage/CCT) × 60 Fixtures
• Grid Suspension Safety Tie Wires (Heavy-duty 12-gauge wire loops) × 1 Block