08/28/2026
WATERVILLE – It was a busy meeting for the City of Waterville, Ohio City Council recently, with updates on significant construction projects and several other matters.
The Roche de Boeuf Bridge is undergoing selective demolition, with Kokosing operators carefully removing dirt and crumbling spandrel walls in order to save the arches and piers of the 118-year-old concrete structure as a base for a future pedestrian and bike bridge.
Meijer is moving forward with the installation of two right-turn lanes between the S. Pray Boulevard store and S.R. 64, beginning after Labor Day. Council approved a cost reimbursement agreement with Meijer for a traffic signal at the eastbound on/off ramp with U.S. 24.
The Waterville Monclova Road widening project is progressing, on track to be completed by Oct. 5. Beginning soon will be the replacement or mud-jacking of 275 sidewalk panels on Fourth and Fifth streets from Farnsworth to Elm, and on Second Street between the south and north dead ends. The project will also include the replacement of 16 ADA ramps.
Read more about these projects and other matters addressed at council, including a non-emergency notice from the City of Bowling Green on the water supply, in AWFP reporter Karen Gerhardinger's full story: https://toledofreepress.com/waterville-receives-construction-project-updates/
IMAGE: Rex Childers, of the Save the Bridge Association, took this photo of work being done on the Roche de Boeuf Interurban Bridge from the balcony of Heritage Village Waterville. He described the work by operators as similar to ballet as they gently remove the dirt on top of the arches. (Courtesy photo)