Time for another Blatchley "Backyard" update!!
Now that the dust has settled from the amazing Bobcat work of our friend, Trace, it was time to move into our next phase of the project!!! This time, drainage lines were the focus!!
On Tuesday, the "crew" got together to continue the finer details of prepping the back of the clubhouse property for our upcoming paver patio installation!! Areas near the building were cleaned up, some additional leveling was done, and decisions were made to redo drainage out of the building (basement drain) and downspout water movement!! And, that meant...bring in the heavy equipment!
A trencher was rented and brought in to the mix, digging nearly 100 feet of trench areas for new piping!! Wow, what an experience that was!! But, it sure saved our crew (7-8 "old guys") from hand digging those for the new piping!!
3 hours of trenching made it possible for us to put in new exit pipes (green) for the basement line (which was a series of broken clay pipes, all filled with dirt), and 2 flexible drainage pipes (black) to remove rainwater from the roof!! Each line was 30+ feet long!!
All pipes now set, backfilled, and covered!!! Given a few days to settle (maybe with a little rain), we'll be ready to begin the next phase...building of the "beauty rock" retaining wall!! And, maybe a start on the new tiered walkway on the west side of the building!
Stay tuned for more of our adventure! (And feel free to donate large bottles of Tylenol!)