03/04/2018
During the snow storm, I walked the trails at the end of Whitmyer Drive. There were many downed branches that I moved out of the way. Sadly, a huge double branch broke from a tree by the newly-constructed bridge at the left side of the water treatment facility. The branch pushed into the left railing, pushing out the railing’s bottom attachment points. The rail is still weakly attached, but wobbly. We will have to reinforce in the spring. The downed branch was too awkward/heavy for me to move by myself in the storm.
-Amy