NOVA TRAC

NOVA TRAC We are members of the community seeking to improve transit in Northern Virginia. Support our project to build a modern commuter rail line to Western Loudoun.

We need a sustainable transportation system for Northern Virginia, not more of the same. Let's win a state-lead feasibil...
04/09/2026

We need a sustainable transportation system for Northern Virginia, not more of the same. Let's win a state-lead feasibility study of W&OD Rail-with-Trail to explore a greener path forward.

We set the record! Thank you to everyone who left comments for the Northern Virginia Transportation Commission's recent ...
03/06/2026

We set the record! Thank you to everyone who left comments for the Northern Virginia Transportation Commission's recent commission meeting, and thank you to the NVTC for your commitment to transportation and public participation.

A state-lead feasibility study will help us understand the costs and benefits of W&OD Rail-with-Trail, and how it can pr...
02/05/2026

A state-lead feasibility study will help us understand the costs and benefits of W&OD Rail-with-Trail, and how it can protect and invest in the W&OD trail.

Join us and let's win a study!

01/12/2026

Learn about another Rail-with-Trail project in Indiana that's connecting communities with modern, electric commuter rail, alongside a trail that was once a railroad! This project shows that Rails-with-Trails are possible. Let's win a feasibility study of W&OD Rail-with-Trail.

Thank you for the footage of the Monon Corridor!

Watch our Executive Director speaking to Loudoun County's delegation to the Virginia General Assembly at their Pre-Sessi...
01/10/2026

Watch our Executive Director speaking to Loudoun County's delegation to the Virginia General Assembly at their Pre-Session Hearing! Thank you John McAuliff for Virginia for sharing!

Yesterday, we attended the Loudoun Delegation to the General Assembly at their Pre-Session Legislative Hearing, sharing ...
01/08/2026

Yesterday, we attended the Loudoun Delegation to the General Assembly at their Pre-Session Legislative Hearing, sharing the importance of a feasibility study on W&OD Rail-with-Trail.

Thank you to the Senators, Delegates and the Town of Leesburg for hosting this event, and thank you to the members of the community who shared their priorities for the upcoming legislative session.

Join us tomorrow and tell Loudoun's General Assembly delegation that you want them to pass a feasibility study of W&OD R...
01/05/2026

Join us tomorrow and tell Loudoun's General Assembly delegation that you want them to pass a feasibility study of W&OD Rail-with-Trail in the upcoming legislative session!

Register here: https://forms.gle/4WR3opoRLkn6Z1268

Join us and fight to win a feasibility study of W&OD Rail-with-Trail in 2026! A feasibility study is the first step to r...
01/04/2026

Join us and fight to win a feasibility study of W&OD Rail-with-Trail in 2026! A feasibility study is the first step to reconnecting our communities, uplifting the trail and improving our transportation system.

W&OD Rail will protect the trail, reserving the vast majority of the parkland for trail use, all while while making comm...
12/13/2025

W&OD Rail will protect the trail, reserving the vast majority of the parkland for trail use, all while while making commutes easier, improving the biking and walking experience, and connecting our communities.

Methodology: The W&OD Railroad Regional Park as a 45-mile, 100 foot wide corridor, which is ~545 acres. We then estimate W&OD Rail's footprint using a 38-mile alignment length, and an assumed 35-45 ft rail operating/clearance width. That equals ~161-207 acres, or about 29-38% of the total park area.

SMART shows that Rails-with-Trails work to sustainability connect communities, reduce traffic and expand mobility option...
12/08/2025

SMART shows that Rails-with-Trails work to sustainability connect communities, reduce traffic and expand mobility options for riders, bikers and pedestrians.

Thank you for sharing these graphics!

Let's use an existing right-of-way to build sustainable transit, while protecting and improving the trail.
10/21/2025

Let's use an existing right-of-way to build sustainable transit, while protecting and improving the trail.

Address

Leesburg, VA

Alerts

Be the first to know and let us send you an email when NOVA TRAC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to NOVA TRAC:

Share