08/18/2026
Installation of Two Reverse osmosis units at Two Municipal water wells in Gaza Strip:
Site Handover: The project sites were handed over to the contractor, enabling the contractor to initiate the preparatory and installation activities.
Materials Approval and RO Assembly: The contractor finalized the materials approval in coordination with CMWU and has started assembling the first and the second reverse osmosis (RO) unit.
The photos we can share are limited.
We would like thank WF AID The World Federation of KSIMC and ANERA for making this all possible.
Most of all thank you all for your generosity.