03/31/2023
The Ella Redkey Pool will be closed Tuesday, April 4 - Sunday, April 16, 2023 for our Spring Maintenance Closure!
During this closure we will be repairing equipment around the pool and facility, and completing the renovations in the Locker Rooms! One of the projects from the Capital Campaign that we have been fundraising for in the past two years is the total renovation of each of the locker rooms. In March, the floor was completed in the bathroom areas. This time, the same flooring will be completed through the entrance area and main area of the locker room. This means we are tearing out the carpet as well!
Along with the new flooring, we will have upgraded, larger lockers that allow hanging space inside. We will also have more benches throughout to allow for more seating options, and upgraded changing stalls in both women's and men's locker room!
Thank you to EVERYONE for all your continue support and understanding through these transition times.
For the Aqua Egg Hunt, it will be happening on Saturday, April 8th from 12:30pm - 3pm during the Maintenance Closure!
Check in will be through the locker gate, the lower restrooms will be available for use, along with a portion of the locker rooms. Participants may need to come already dressed in their suits.
For any questions, please feel free to give us a call at 541-273-1477 or email us at [email protected]