10/09/2026
𝗛𝗶𝗴𝗵𝗹𝗮𝗻𝗱 𝗛𝗶𝘀𝘁𝗼𝗿𝘆 𝗶𝗻 𝘁𝗵𝗲 𝗠𝗮𝗸𝗶𝗻𝗴:
Did you catch Highland Township Supervisor Rick A. Hamill on the YouTube channel Outdoors with the Morgans? Rick recently traveled to Pennsylvania to purchase tamarack lumber for an upcoming project right here in Highland!
📺 Watch the video: https://youtu.be/HbFT6L6jsA4
Rick's discussion about Highland begins around the 11:00 mark in the video!
𝗕𝗮𝗰𝗸 𝗶𝗻 𝘁𝗵𝗲 𝗗𝗮𝘆…
Highland's history is deeply connected to its natural landscape. When Joseph Wampler first surveyed Highland Township in 1823, today's Livingston Road followed an east-west section line through the area's varied terrain, passing Featherbed Marsh, Pettibone Creek, and a tamarack swamp before rising to the plain surrounding Highland Station.
Tamarack, also known as American larch, is a distinctive tree that thrives in wetland environments. Its wood is valued for its strength and natural resistance to decay, making it a practical choice for certain outdoor applications. These qualities, along with its connection to Highland's natural heritage, make tamarack a meaningful material for this project.
𝗖𝗼𝗻𝗻𝗲𝗰𝘁𝗶𝗻𝗴 𝗢𝘂𝗿 𝗣𝗮𝘀𝘁 𝘁𝗼 𝗢𝘂𝗿 𝗙𝘂𝘁𝘂𝗿𝗲
The tamarack lumber purchased by Supervisor Hamill will be used in the construction of a new gateway sign welcoming residents and visitors to Historic Highland Station.
The Highland Downtown Development Authority (DDA) is leading this project at the corner of Milford Road and Highland Road (M-59). The gateway sign is a special allowance associated with the Sheetz development and will help create a welcoming entrance to Historic Highland Station.
Tamarack was selected not only for its natural durability but also for the connection it represents to Highland's landscape and history. Its use brings a piece of that natural heritage into a new landmark designed to welcome future generations. As with any outdoor wood installation, appropriate detailing and finishing will help protect the lumber from the elements over time.
𝗪𝗵𝗮𝘁'𝘀 𝗡𝗲𝘅𝘁?
Installation is scheduled to begin in mid-October, with the project expected to be completed in December.
𝗖𝗵𝗲𝗰𝗸 𝗼𝘂𝘁 𝘁𝗵𝗲 𝗮𝘁𝘁𝗮𝗰𝗵𝗲𝗱 𝗿𝗲𝗻𝗱𝗲𝗿𝗶𝗻𝗴 𝗶𝗻 𝘁𝗵𝗲 𝗰𝗼𝗺𝗺𝗲𝗻𝘁𝘀 𝗳𝗼𝗿 𝗮 𝗽𝗿𝗲𝘃𝗶𝗲𝘄 𝗼𝗳 𝘁𝗵𝗲 𝗽𝗹𝗮𝗻𝗻𝗲𝗱 𝗴𝗮𝘁𝗲𝘄𝗮𝘆 𝘀𝗶𝗴𝗻!
Click: https://www.amazon.com/dp/B07SRK1F3Y?maas=maas_adg_E15BE12F9...