10/22/2026
I haven't posted project progress for a while. Currently in the middle of the fuselage. Pictured is the baggage floor and ribs, mounted aft of the channel where wings attach. This work is done on a low profile work surface that i call the 'coffee table'. Also pictured are the seat ribs that will be placed forward of the channel piece.