ARR Trail Crew

ARR Trail Crew Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from ARR Trail Crew, Nonprofit Organization, 23610 Hamilton Pool Rd, Dripping Springs, TX.

The Austin Ridge Riders mission is to develop trails by promoting trail stewardship in cooperation with local land managers, improve mountain bike awareness and access, and bring people together to build a strong off road cycling community.

Big shout out to Nick Hentschel, MJ Shult, Alex Murillo, and Joe Thomas for joining trail steward Ron Perry out at Reime...
07/26/2026

Big shout out to Nick Hentschel, MJ Shult, Alex Murillo, and Joe Thomas for joining trail steward Ron Perry out at Reimers Ranch this morning. We managed to get new posts set that will soon help riders navigate their way around this awesome trail system. We also roughed in a new return line to the trailhead and blocked an unsustainable bandit line. All done in less than 3 hours! Ride the trails and go for a swim in the river. It's worth the trip!

Sunday, July 26th at 9am: Join ARR Trail Steward Ron Perry for a workday at Milton Reimers Ranch Park. This workday will...
07/17/2026

Sunday, July 26th at 9am: Join ARR Trail Steward Ron Perry for a workday at Milton Reimers Ranch Park. This workday will focus on installing navigational signage to improve the rider experience. Ron has been working with the Park Director and they have a vision to make these trails a true mountain biking destination. If you’ve never ridden out here, you’re missing out on some great trails with a huge variety of terrain.

For additional details and to RSVP please click here: https://www.tickettailor.com/events/arrtrailcrew/2270506

Saturday, June 20th.  10 am to Noon.  Mary Moore Searight Park.  All this rain has been great for the trails and they ne...
06/17/2026

Saturday, June 20th. 10 am to Noon. Mary Moore Searight Park. All this rain has been great for the trails and they need some love to be ready once the dirt dries. Join ARR trail stewards at Mary Moore Searight park for some trimming and trail corridor work. https://buytickets.at/arrtrailcrew/2259205

Austin Ridge Riders Post-rain impromptu trail work at Powerline Flow 5-berm section at Walnut today. It’s been a little ...
06/09/2026

Austin Ridge Riders Post-rain impromptu trail work at Powerline Flow 5-berm section at Walnut today.

It’s been a little more than 10 years (if I’m not mistaken) since the first concrete urban trail went in at Walnut.

It crossed the existing natural surface trail in several places, and Austin Ridge Riders worked with the City to secure permission for re-routes. One of the re-routes involved us digging under the bridge (creating head clearance).

The idea of having multiple berms here was to slow down runoff, while also creating something fun to ride. The old line was riding straight down Powerline Hill, so we (Charlie Riou leading) created Powerline Flow that riders would choose to not cross the concrete at a 90 degree angle (T-boning folks).

The berm radii are tight; and in retrospect, they could have been opened up a bit more. However, tighter berms do work if the faces are steeper. Over the next couple months (praying for rain), we’ll be able to get the 5-berm section shaped up again, with some progress made today.

Thanks everyone!!

—Cullen McMorrow VP, and Joe Wieck, Trail Coordinator

With the recent rain and amazing cool front weather, ARR Trail Crew was back at Mark’s Art at Walnut Creek Metro Park on...
05/04/2026

With the recent rain and amazing cool front weather, ARR Trail Crew was back at Mark’s Art at Walnut Creek Metro Park on May 2 to build a new inslope turn (aka berm!). The dirt conditions were ideal, with perfect dampness for shaping and packing—once the summer sets in, there will be fewer opportunities like this.

Thanks to the hardworking volunteers: Alden Hoffman, Colin Hancock, Cullen McMorrow, Joe Wieck, Rafal Butryn, Sean Pietri, and Travis Taghavi.

Walnut Creek Trail Steward, Cullen McMorrow, took advantage of the wet dirt and pulled together a crew to make some mass...
04/23/2026

Walnut Creek Trail Steward, Cullen McMorrow, took advantage of the wet dirt and pulled together a crew to make some massive improvements to the Powerline Flow Berms next to the regional trail. Once this dirt has a chance to settle, this section of trail is going to rip!

Special thanks to Rafal Butryn, Craig Thomerson, Manuel Gallegos, Drew Eschelberger, Clifton Wendel, Rich Hollenbeck, Geoff Hargreaves, Joe Wieck, Charlie Riou, and Sue Rose

This rain has made for some great trail work opportunities and the trails really needed it.  Brushy Creek Trail Steward ...
04/23/2026

This rain has made for some great trail work opportunities and the trails really needed it. Brushy Creek Trail Steward Tommy Kerstetter took advantage of the soft dirt to fix some problem areas on Double Down as well as adding a new berm and tuning up a drop. This trail is rated as advanced so the goal here is to keep the difficult nature of the trail while ensuring erosion is controlled. When it dries up a little, go check it out!

Walnut Creek had a special visitor last week.  Mark Henneke, the ‘Mark’ in ‘Marks Art”, spent some time with ARR preside...
04/14/2026

Walnut Creek had a special visitor last week. Mark Henneke, the ‘Mark’ in ‘Marks Art”, spent some time with ARR president Charlie Riou and current Walnut Creek Trail Steward and VP Cullen McMorrow exploring the changes that have taken place in the park since Mark built much of the single track out there that we ride today. There is a LOT of Austin trail building goodness between these three legends. Another Walnut Creek legend, Geoff Hargraves, also made an appearance. Special day!

Shout out to Austin Ridge Riders Mountain Bike Club trail crew volunteers who were able to come out the last two times w...
04/07/2026

Shout out to Austin Ridge Riders Mountain Bike Club trail crew volunteers who were able to come out the last two times we got decent rain, to have perfect damp dirt to work with. (There is only a short period of time when dirt is damp enough to shape and pack).

On March 12, we worked on Windy Loop, building two new berms and a log-roller feature.
Thanks a ton to Alden Hoffman, Rafal Butryn, Derrick Hurst, Dereck Padden, Dewayne Buratti, Jonas Weigert, Winston Arango, Alexander Arango, Joe Wieck, and Cullen McMorrow.

And Yesterday, April 5, we worked on Mark’s Art, building a new berm and step-down-roller.
Thanks a million to Ron Perry, Clifton Wendel, Peter Clauter, Robert Wood, Geoff Hargreaves, Melody Hargreaves, Gabe Hargreaves, Daniel DiDomenico, Brian Preston, Walter Perry, Joe Willman, and Cullen McMorrow.

Address

23610 Hamilton Pool Rd
Dripping Springs, TX
78620

Alerts

Be the first to know and let us send you an email when ARR Trail Crew posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share