05/12/2026
Schools out for SUMMER , and that means that updates and renovations are underway at Ripley Co R-IV (Lone Star). I’m looking to have discussions with interested contractorsand take bids on the following services.
**Sandblasting and repainting playground equipment and metal chain link fencing.
* Installing a new section of fence
*Painting existing metal buildings
*Campus Powerwashing (Industrial capability preferred)
*Pea gravel removal and site leveling
*concrete repair
*landscaping barrier installation
*2 new metal logo signs
*Installation of 3 water fountains
*Installation of parking curbs, emergency and disabled designations.
School will be back in session before we know it and I would like to be started on these projects by June1. If interested, please call me, Carly Carter, Superintendent at 573-996-7118, or stop by the school located at 3277 US Hwy 160W in Doniphan.