09/04/2026
A Good Friday afternoon to everyone. Here’s a little heads up about the road construction activity on highway 152 from highway 6(Triggers) to highway 34(5 Mile Corner). ODOT will be closing that section of 152 down for approximately 180 days while the road construction is being done. This will begin on September 21st. Below is the map of the detour along with details from ODOT.