07/16/2026
Thurs 8/6 fron 6:00-8:30 PM - Reid Overpass Replacement Project - Public Meeting #2
Morse School, Auditorium
40 Granite Street, Cambridge, MA 02139
Not sure if there's an online option for this meeting!
The William Red Overpass is near but not on the BU Bridge)
"The proposed project consists of removing the existing William Reid Overpass, which, though safe for all users, has reached the end of its useful lifespan and should be replaced, with either a reconstructed intersection of Memorial Drive and Brookline Street and a new overpass or a reconstructed intersection in which Memorial Drive and Brookline Street would cross each other at-grade. The project also proposes replacing the bridge carrying Memorial Drive over the Grand Junction Railroad Line. Additional goals of this project include significant enhancements to bicycle and pedestrian connectivity at the intersection and consolidation of transportation assets to return space to accessible parkland if possible."
A Public Informational Meeting will be held by MassDOT to discuss the proposed project in Cambridge, MA.