Construction activities for asphalt repairs are scheduled to take place from ๐๐ฎ๐ง๐ ๐๐, ๐๐๐๐ ๐ญ๐ก๐ซ๐จ๐ฎ๐ ๐ก ๐๐ฎ๐ง๐ ๐๐, ๐๐๐๐, between the hours of ๐:๐๐ ๐.๐ฆ. ๐๐ง๐ ๐:๐๐ ๐ฉ.๐ฆ. each day. The traffic signal at Second St. and Maple will be in flash during construction hours.
To safely accommodate the work, Northbound Second Street will be closed to through traffic from Oak Street to Maple Street during construction hours. Southbound Second Street will remain open and accessible throughout the duration of the project for southbound traffic on Second St.
A signed detour route will be implemented to direct northbound traffic around the work zone. Detour signs will be placed at Oak Street and along the designated route to guide motorists around the closure and back onto Northbound Second Street at Maple Street.
Appropriate traffic control devices, including advance warning signs, barricades, and detour signage, will be installed and maintained in accordance with applicable traffic control standards. Access for local residents and emergency vehicles will be maintained as conditions permit.
The closure and detour will be removed at the end of each workday or upon completion of the asphalt repair operations.