Braselton Community Alliance

Braselton Community Alliance We look forward to working together as a community to ensure the best for our area!

As a group of residents, that reside in Braselton or nearby, we promote community and high standards of quality development for Braselton and its surrounding areas.

Do you know someone? Please help save Infinity! https://www.facebook.com/share/p/17gAdFm2Nc/?mibextid=wwXIfr
11/07/2025

Do you know someone?
Please help save Infinity!

https://www.facebook.com/share/p/17gAdFm2Nc/?mibextid=wwXIfr

💙 A Message from Infinity Floating & Healing Center 💙
With heavy hearts but hopeful spirits, we share that the property where Infinity Floating & Healing Center has flourished for the past 8 years is being sold — unless we are able to step forward and make a $2.6 million purchase by Thursday, November 12, 2025.
We are reaching out to our community, friends, and extended family to help us find a Good Samaritan, Angel, Humanitarian, or Investor who believes in our mission and can help save Infinity. Without this miracle, we will be forced to close our doors at the end of December 2025.

In the midst of this challenge, we are deeply honored to share that we have just been awarded Google’s “Best of Jackson County 2025 – Health Spa”. Earlier in the year, Infinity was awarded “Best Day Spa in Georgia in 2024”, and we’re on the lookout for the 2nd year in a row for 2025. These recognitions reflect the love, care, and healing energy we have poured into every client relationship and every service over the past 10 years.

It’s heartbreaking to imagine that a decade of wellness, compassion, and community could lose its home — not for lack of heart, but due to circumstances beyond our control.
If you have a gift card or pre-purchased service, please schedule your session before December 15, 2025, as that will be our final day of operation unless an investor steps forward.

💫 We are calling on our community.
If you know someone with the means and heart to help preserve this sanctuary of healing, please connect them with us immediately. Urgency is key.

We have been proud tenants for 8 years with an impeccable record and recommendation from our property owner. Unfortunately, an outside company approached off-market and offered full assessed value to take over the property.

Let’s show what community strength really means. Together, we can make sure Infinity continues to serve as a place of healing, hope, and restoration for years to come.
With gratitude,
Deborah Helms and Lyn Ragan
Infinity Floating & Healing Center
📍 32 Johnson Drive, Braselton, GA 706-654-7118 - Office
🌐 www.InfinityFloating.com
📧[email protected] | 📞 770-843-3889 - Cell

Town of Braselton Mayoral, District 2 and District 4 voting results as of 11/4/25 8:25 pm with early voting and Election...
11/05/2025

Town of Braselton Mayoral, District 2 and District 4 voting results as of 11/4/25 8:25 pm with early voting and Election Day results tallied.

These are unofficial results until certified by the Jackson County Board of Elections.

Mayor:
Michael Cronic- total votes 427
Brandon Reed-total votes 152
(I) Kurt Ward- total votes 804

District 2:
(I) Richard Harper- total votes 170
Cheri May- total votes 100

District 4:
(I) James Murphy ran unopposed- total votes 246

Congratulations to Mayor Ward, and Councilmen Harper and Murphy for their wins.

We look forward to continuing to work together to make Braselton even better!

This message pertains to the current Mayoral election in the Town of Braselton.  This will be the one and only post made...
10/27/2025

This message pertains to the current Mayoral election in the Town of Braselton. This will be the one and only post made about the Braselton Mayoral race, so please like and share to help spread the word to fellow voters.

The Alliance has consistently maintained a neutral stance during election periods; however, this campaign flyer has emerged as the most frequently requested topic for discussion, as indicated by the private messages and tags we have received.

It is well understood that campaigns can be divisive, yet throughout the history of this page, we have never encountered a flyer so specifically aimed at a Braselton mayoral election. It has certainly ignited interest in the electoral process!

Rather than the Alliance presenting facts based on experiences during Mayor Ward's current term, we will allow Kurt Ward for Braselton Mayor to articulate his perspective. The link to his response is below.

If Mayoral candidates and Brandon Reed or any resident wish to participate in dialogue about this flyer, share concerns positive or potentially negative, or have questions regarding the Town and/or this election, we encourage all discussions in the comments below.

Please remember that this page does not condone profanity or personal attacks. Violators will be removed.

https://www.facebook.com/share/v/17G3vgNA2z/?mibextid=wwXIf

From Town of Braselton, Mayor Ward.Please like and share to help spread the word and help navigate the FB algorithm. Eve...
08/13/2025

From Town of Braselton, Mayor Ward.

Please like and share to help spread the word and help navigate the FB algorithm.

Ever thought of requesting a Trader Joe’s?

If you want one in Braselton, follow the link below and maybe add some key words like: Braselton Trader Joes @ Capstone Project in 16,000 sf grocery store now approved at Hwy 211 & Thompson Mill Road near Chateau Elan.

Just a thought…

https://www.traderjoes.com/home/contact-us/request-a-store?fbclid=IwZXh0bgNhZW0CMTEAAR4-JCKTRTCl7aFOCRlOo7SGJSi6QUei9N7gt23nKMVhnQiMLmRmTu6dW1-UDQ_aem_Dk1CUr_rf9KHv4bLwL57Uw

https://www.facebook.com/share/1RwMd5aghV/?mibextid=wwXIfr

This is regarding the vacant parcel at the corner of Thompson Mill Road/Grand Hickory Drive (entrance to Mulberry Park) ...
08/06/2025

This is regarding the vacant parcel at the corner of Thompson Mill Road/Grand Hickory Drive (entrance to Mulberry Park) and Hwy 211 across the Highway from Chick-fil-a ddjacent to the Gates of Braselton

https://cms2.revize.com/revize/braseltonga/24-07-RZ%20application.pdf

COUNCIL WORK SESSION
August 7, 2025
4:00 p.m.

III. PUBLIC HEARING

3b. Application # 24-07-RZ
Application for a Major Planned Unit Development Revision/Amendment from Parkway Professional LLC c/o Dillard Sellers on property owned by Parkway Professional LLC. The property is identified as Gwinnett County Tax Parcel R3006A192. The approximate area of the property is 21 acres. The intent of the application is to amend the Chateau Elan Planned Unit Development for a development consisting of the following uses: mixed use office, retail, restaurant, and residential condominium buildings; hotel; parking structures; multi-family buildings; open space; and other commercial uses.

Variance Request #24-08-VAR Attached to 24-07-RZ.
Sec.4.5(C)(5) re: increase in density from 14 units per gross acre to 15.69 units per gross acre.
Sec.4.5(D)(2) re: parking area location adjacent to street.
Sec.4.5(E)(4) re: increase ground floor residential use in multifamily buildings from 75% to 91%.

Special Use Request #24-07-SU Attached to 24-07-RZ
Special Use request to permit multi-family dwellings in a Planned Unit Development.

Planning Director recommended approval with the following conditions:

1. The development shall be consistent with the listed uses, use space allocations, and site plan submitted with the application. Exceptions to this consistency shall be granted if they conflict with conditions imposed by the Mayor and Council. An approved PUD zoning site plan by the Mayor and Council, including conditions of approval, shall supersede any conflicts with the Town of Braselton Development Code. Any design modifications and infrastructure improvements required by the Braselton Public Works Department, Georgia Department of Transportation, and Gwinnett County Department of Transportation, shall be permitted if in conflict with the approved PUD zoning site plan.

2. The Roadway and Site Access improvements identified on page 4 of the Georgia Regional Transportation Authority (GRTA) Notice of Decision (DRI) shall be implemented subject to approval by the Georgia Department of Transportation and Gwinnett County Department of Transportation.

3. The parking deck shall be constructed concurrently with the retail/condominium buildings and retail/loft office buildings. The parking deck should be designed and coordinated with the Town of Braselton to accommodate a pedestrian/golf cart bridge over S.R. 211.

4. The proposed stand-alone multi-family buildings will have internal (with conditioned air) corridor hallways, elevators, and internal stairs for fire safety. There will be no open-air corridors or stairwells.

5. The proposed stand-alone multi-family buildings will feature amenities to include but not limited to a pool, fire pits, fitness center, co-working space, and gathering room. The fitness center, co-working space, and gathering room will be on the first floor of the multi-family building facing the retail buildings to provide a store front appearance.

6. Any first-floor dwelling units of the multi-family building facing the retail buildings will have walk up porches.

7. The proposed stand-alone multi-family building section of the development will include gated/secured parking and locking-door/FOB/secured access control points for the residential entry/exit.

8. No Certificate of Occupancy from Braselton will be granted for the stand-alone multi-family buildings until either Certificate of Completions for shell building construction or Certificate of Occupancies have been issued for the four retail/residential condominium and retail/loft office buildings, including completion of the village green and plaza and all other site and landscaping improvements.

9. A 4 ft. high decorative fence with decorative columns spaced approximately 30 ft. shall be installed in between the development and all public roads and the private street connecting Thompson Mill Road and S.R. 211.

10. Section 6.11 of the Development Code (Tree Planting Requirements and Trees and Landscaping in Parking Lots) shall apply to the development. Section 6.16 (Outdoor Lighting), Section 6.17 – G. (Parking Design) and Section 6.17 – J. (Pedestrian Walkways) shall also apply to the development. The total number of parking spaces may be reduced to accommodate these requirements.

11. A roof top bar and restaurant shall be included with the hotel and/or the retail/loft office buildings.

12. Minimum unit sizes for the apartments shall be as follows: 800 square feet for one-bedroom units and 1,200 square feet for two- or more bedroom units. Three- bedroom apartments shall not compromise more than 15% of the total multi-family units.

13. If not incorporated into the existing funding and design of the S.R. 211 widening project, a 10 ft. wide multi-use path and Braselton streetlights shall be installed along S.R. 211. The path shall either be installed in the S.R. 211 right-of-way or have public accessibility protected via an easement. The Braselton streetlights shall also be installed along the existing multi-use path on Thompson Mill Road. Street trees shall also be planted along both roads. This condition may be modified if deemed prohibited by the applicable governing transportation agency. Spacing shall be approved by staff. These improvements may be deferred until the construction of the S.R. 211 widening. In such a case, the developer shall provide the Town with a surety payment to be utilized at the time such improvements are installed.

14. The final architectural elevations and final landscape plans, including hardscape plans for the village green and plaza, shall be approved by the Mayor and Council.

15. Braselton streetlights and street trees shall be installed along the main internal street connecting Thompson Mill Road to S.R. 211 (across from Auger Falls Drive). Spacing shall be approved by staff.


Planning Commission recommended approval with the following conditions:

1. Approval of this Planned Unit Development (“PUD”) application supersedes any prior zoning, and heretofore, the owner of this parcel relinquishes any and all claims as a legacy PUD in the Town of Braselton.

2. The development shall be consistent with the listed uses, use space allocations, and site plan submitted with the application. Exceptions to this consistency shall be granted if they conflict with conditions imposed by the Mayor and Council. An approved PUD zoning site plan by the Mayor and Council, including conditions of approval, shall supersede any conflicts with the Town of Braselton Development Code. Any design modifications and infrastructure improvements required by the Braselton Public Works Department, Georgia Department of Transportation, and Gwinnett County Department of Transportation, shall be permitted if in conflict with the approved PUD zoning site plan.

3. The Roadway and Site Access improvements identified on page 4 of the Georgia Regional Transportation Authority (GRTA) Notice of Decision (DRI) shall be implemented subject to approval by the Georgia Department of Transportation and Gwinnett County Department of Transportation.

4. The parking deck shown on the PUD site plan shall be constructed no later than or concurrently with the hotel. The parking deck should be designed and coordinated with the Town of Braselton to accommodate a pedestrian/golf cart bridge over S.R. 211 that will be initiated and financed by the Town of Braselton.

5. The hotel will be branded as either Marriott, Hilton, IHG, or Hyatt, and the hotel chain scale will be established in accordance with the Smith Travel Research Chain Scale ("STR"). If the hotel brand is Marriott, it will be one of the Marriott brands listed under STR as Luxury, Upper Upscale, Upscale, or Courtyard. If the hotel brand is Hilton or IHG, it will be one of the Hilton or IHG brands listed under STR as Luxury, Upper Upscale, or Upscale. If the hotel brand is Hyatt, it will be one of the Hyatt brands listed under Luxury, Upper Upscale, Upscale, Hyatt House or Hyatt Place.

6. Regarding the three stand-alone multi-family (“apartment”) buildings:
a) Minimum unit sizes for the apartments shall be as follows: 800 square feet for one­bedroom units, average across one-bedroom units; 1,000 square feet for two-bedroom units, average across two-bedroom units; and 1,200 square feet for three-bedroom units, average across three-bedroom units.
b) The apartment buildings shall have internal (with conditioned air) corridor hallways, elevators, and internal stairs for fire safety. There will be no open-air corridors or stairwells.
c) The apartments shall have amenities to include but not limited to pool, fire pits, fitness center, co-working space, and gathering room. “Non-residential apartment space” including fitness center, co-working space, and gathering room will be on the first floor of the apartment building facing the retail buildings to provide a store front appearance. Non-residential apartment space shall constitute minimum 6,500 square feet of ground floor area in apartment building.
d) Any first-floor apartment units facing the retail buildings shall have walk-up porches.
e) The apartment building section of the development shall include gated/secured parking and locking-door/FOB/secured access control points for the residential entry/exit.
f) The apartment buildings shall include at least two pet relief areas, designed as minimum 2,500 square feet outdoor fenced area with natural or artificial turf and waste receptacles.
g) No Certificate of Occupancy from Braselton will be granted for the apartment buildings until Certificate of Completions or Certificate of Occupancies have been issued for at least the following items per the submitted site plan (i) three retail buildings, including a rooftop bar and restaurant, and (ii) a Village Green and Plaza.

7. The Village Green and Plaza shall consist of a minimum 44,400 square feet of ground area, including a minimum 20,000 square feet of artificial turf recreation area.

8. A 4 ft. high decorative fence with decorative columns spaced approximately 30 ft. shall be installed in between the development and all public roads and the private street connecting Thompson Mill Road and S.R. 211.

9. Section 6.11 of the Development Code (Tree Planting Requirements and Trees and Landscaping in Parking Lots) shall apply to the development. Section 6.16 (Outdoor Lighting), Section 6.17 - G. (Parking Design) and Section 6.17 - J. (Pedestrian Walkways) shall also apply to the development. The total number of parking spaces may be reduced to accommodate these requirements.

10. If not incorporated into the existing funding and design of the S.R. 211 widening project, a 10 ft. wide multi-use path and Braselton streetlights shall be installed along S.R. 211. The path shall either be installed in the S.R. 211 right-of-way or have public accessibility protected via an easement. The Braselton streetlights shall also be installed along the existing multi-use path on Thompson Mill Road. Street trees shall also be planted along both roads. This condition may be modified if deemed prohibited by the applicable governing transportation agency. Spacing shall be approved by staff. These improvements may be deferred until the construction of the S.R. 211 widening. In such a case, the developer shall provide the Town with a surety payment to be utilized at the time such improvements are installed.

11. The final architectural elevations and final landscape plans, including hardscape plans for the village green and plaza, shall be approved by the Mayor and Council.

12. Any primary use area shown on the submitted site plan (e.g., retail building, hotel, etc.) not development concurrently with the apartment buildings and disturbed for site development shall be landscaped and maintained to include natural ground cover and tree plantings, until such time as use and buildings are developed.

13. Braselton streetlights and street trees shall be installed along the main internal street connecting Thompson Mill Road to S.R. 211 (across from Auger Falls Drive). Spacing shall be approved by staff.

Diabolo’s has shuttered. Their sign is down and a lease sign is up in the window.
04/12/2025

Diabolo’s has shuttered. Their sign is down and a lease sign is up in the window.

Looking for a volunteer your time within your own community? https://www.facebook.com/share/p/159pBt3KDf/?mibextid=wwXIf...
02/11/2025

Looking for a volunteer your time within your own community?

https://www.facebook.com/share/p/159pBt3KDf/?mibextid=wwXIfr

Braselton Community Development Announces Community Clean-Up Event to Promote Environmental Stewardship and Civic Pride

The Town of Braselton is pleased to announce its upcoming Community Clean-Up Event, scheduled to take place on Saturday, March 29. This initiative aims to foster environmental awareness, enhance community engagement, and beautify our shared spaces.

With a focus on environmental stewardship and civic pride, volunteers of all ages are invited to join us in making a tangible difference in our community. The event will begin at the Asa Carlton building, 100 High Point Parkway between 8:30am and 9:30am. Anyone interested can pick up supplies and instructions.

Participants will then disperse to designated areas throughout the town to collect litter, remove debris, and tidy up public spaces.

"This clean-up event is more than just picking up trash; it's about coming together as a community to demonstrate our commitment to preserving and enhancing the environment we all share," said Amy Pinnell, Community Development Direct for the Town of Braselton. "By taking action together, we can create a cleaner, healthier, and more vibrant community for everyone."

Community members, local businesses, schools, and organizations are encouraged to participate and contribute to the success of this event. Trash bags, safety vests, and other clean-up materials will be provided.

"We believe in the power of collective action and the positive ripple effects it can have on our community," added Christopher Sorrell, Braselton’s Stormwater Manager. "Together, we can inspire change, instill a sense of pride in our surroundings, and create a lasting impact for generations to come."

All participants who pre-register before 5pm on March 27 can request a free T-shirt to pick up on the morning of the event. Otherwise, shirts will be handed out on a first-come, first-serve basis while supplies last. To pre-register visit: https://Braselton.formstack.com/forms/braseltoncleanup

For more information and updates on the event, please visit www.Braselton.net or contact Amy or Christopher at 706-654-3915.

The sign has gone up! It is located at Liberty Village in the  new development in front of Ace Hardware at 211 and Golf ...
02/07/2025

The sign has gone up! It is located at Liberty Village in the new development in front of Ace Hardware at 211 and Golf Club Drive/Liberty Church Road.

Address

Braselton, GA

Website

Alerts

Be the first to know and let us send you an email when Braselton Community Alliance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Braselton Community Alliance:

Share