11/01/2014
Volunteer Update: We had a tremendous turnout of volunteers today and were able to get a lot of work done.
* We moved nearly all of the 5'x8', 4'x8', 3'x8' and 2'x8' panels over to our Plain Street location. The panels we didn't move are the ones that go into the trailers at Pond Street (stone, paneling, doorways, and other specialty panels).
* The 3rd floor of the haunted house has been completely moved out of. Compressors are moved and everything is cleaned up.
* The 2nd floor of the haunted house has been been completely cleaned out. All props, panels, staples, screws and trash has been moved. And the floor has been vacuumed.
* The 1st floor is nearly clean. We consolidated everything to the 1st floor kitchen area that needs to go into the trailers on 90 Pond Street.
* Street signs have been disassembled and the signs into our building have been taken down.
* The stairwells have been cleaned and vacuumed.
We had a lot of people there and were able to do everything we could do in the rain. What we couldn't do is load the electronics, decorations and other items that can't get wet into the trailers at 90 Pond Street. This is something we can only do during daylight and only during dry weather. We hope to finish on our first dry Saturday which we hope is November 8th. Look for updates on our facebook, twitter and website pages.
Thank you to everyone that showed up today and lend a hand.
Thank you.