04/22/2015
Important info you need to know.
BARTLETT ROAD WILL BE CLOSED FOR CONSTRUCTION OF NEW BRIDGE
Beginning MAY 4, 2015, Bartlett Road between Stage and Bartlett Blvd will be CLOSED TO ALL TRAFFIC in preparation for the construction of a new bridge on Bartlett Road over Harrington Creek.
Barricades and traffic detour signs will be installed to direct traffic around the construction site. Please use caution as you travel along the detour route.
To access Bartlett Road and Ferguson Road, traffic going north on Bartlett Blvd will need to continue north to Stage Road, turn left (west) and continue on Stage Road, turn left (south) on Bartlett Road and use the temporary bypass to Ferguson Road.
To access Bartlett Blvd south, traffic going east on Ferguson Road will need to use the temporary bypass, go left (north) on Bartlett Road to Stage Road, turn right (east) then continue east on Stage Road to Bartlett Blvd, turn right (south)
All traffic that routinely uses Bartlett Road as a cut through from Bartlett Blvd to Stage Road will have to use the detour route, follow the signs, as this section of Bartlett Road will be closed to all traffic during the bridge construction period.
Access will be maintained to the Veterans Memorial parking lot by using Bartlett Road off of Bartlett Blvd.
Construction is scheduled to be complete by November 30, 2015.
Please contact the City of Bartlett Engineering Department, Mr. Rick McClanahan, P.E. or Wade Towles, P.E. at (901) 385-6499 if you have any questions.