07/24/2019
Warmer. Safer. Drier. Each and every volunteer at High school musical worked on each and every one of these standards this summer. A shed roof overlay was completed along with underpinning around the trailer. In the kitchen we did floor system repair, all new subfloor, and vinyl coverings. There was also stud repair in the walls and drywall added all throughout the kitchen. The bathroom was also completely renovated. All appliances were taken out and replaced with new ones. New drywall, subfloor and coverings were installed and the walls were painted. Stairs were built for the back porch and a drainage ditch was dug in the front yard that led into the creek. Plumbing was subcontracted to change the galvanized pipes to PEX which helped with the water pressure and temperature. New doors were installed in the front and back and a new for the hall was installed. We also installed both a bathroom and bedroom door.
Warmer. Safer. Drier. Each and every volunteer at High school musical worked on each and every one of these standards this summer. A shed roof overlay was completed along with underpinning around the trailer. In the kitchen we did floor system repair, all new subfloor, and vinyl coverings. There was also stud repair in the walls and drywall added all throughout the kitchen. The bathroom was also completely renovated. (Check out the transformation below) All appliances were taken out and replaced with new ones. New drywall, subfloor and coverings were installed and the walls were painted. Stairs were built for the back porch and a drainage ditch was dug in the front yard that led into the creek. Plumbing was subcontracted to change the galvanized pipes to PEX which helped with the water pressure and temperature. New doors were installed in the front and back and a new for the hall was installed. We also installed both a bathroom and bedroom door.