WW&F 21 Campaign

WW&F 21 Campaign The Wiscasset, Waterville & Farmington Railway Museum is building new boilers for locomotive #10 and the new locomotive we are building, #11. Get involved!

With roots reaching back to 1854 but alive and kicking in the 21st Century, the Wiscasset, Waterville & Farmington Railway Museum announces its 21 Campaign. "21" represents our commitment to both restoring locomotive #10 to service and building locomotive #11, a reconstruction of original WW&F locomotive #7. The goals of today’s WW&F Railway are grandiose and plentiful - consistent with the outlook of the Wiscasset & Quebec Railroad in the mid 1800’s.

11/05/2025

Heated progress on the boiler for locomotive 10 at the Wiscasset, Waterville and Farmington Railway Museum.

Progress on locomotive 10's boiler from Maine Locomotive & Machine Works!
10/07/2025

Progress on locomotive 10's boiler from Maine Locomotive & Machine Works!

Wiscasset, Waterville and Farmington Railway Museum #10's new boiler is making fantastic progress!

Progress report on locomotive 10!
09/04/2024

Progress report on locomotive 10!

Engine 10 - The rebuild crew has been busy organizing boiler parts and working on the front end. This photo shows Nick, Dan, Bob and Dana installing the new smokebox saddle. The cab and frame of the locomotive are in bay 1 of the shop.

Rebuilt gauge for WW&F Locomotive  #10!
06/17/2024

Rebuilt gauge for WW&F Locomotive #10!

12/12/2022

Progress on locomotive #11....

05/11/2022
Rick is also working on the new boiler for locomotive  #10...
04/12/2022

Rick is also working on the new boiler for locomotive #10...

A special Build 11 update from one of our volunteers...

Hi everyone. I’m Rick Sisson, a member of the WW&F Ry Museum for more than 20 years. I love volunteering there, but because I live more than 200 miles away, and because of Covid era restrictions, I’m not able to get to Maine as often as I’d like. As a member of the Build 11 engineering team, I’m able to contribute to that project by working from home, or “remote working”. I develop designs and drawings on my computer using CAD programs that are shared with and reviewed by the Build 11 team. I can collaborate with the entire team using Zoom meetings.

We’ve partitioned the Build 11 construction efforts into 5 phases. The first of these constitutes the forward frame which incorporates two cylinder saddle castings. These are large, complex components weighing about 1600 pounds each. We expect to receive the raw castings this summer which we will send to a local shop to get them machined to our specifications. This operation is complex, requiring specialized machine tools and will take a fair amount of shop time to complete.

Accordingly, this will consume a significant portion of this years Build 11 budget. Your contributions to the Build 11 campaign will ensure that we will be able complete phase 1 of the Build 11 project. And let’s not forget, the first $25,000 contributed this year will be matched by the Candelaria Fund. This matching grant will accelerate Build 11 progress. A heartfelt thank you to everyone who contributes. You’re all part of the Build 11 team!

02/11/2022

Forging ahead on #10 and #11...

Building 11 means finishing locomotive 10 first. See post for news...
01/11/2022

Building 11 means finishing locomotive 10 first. See post for news...

We teased the video yesterday - here is the full December report on the Build 11 project (whose pre-requisite is to comp...
12/11/2021

We teased the video yesterday - here is the full December report on the Build 11 project (whose pre-requisite is to complete the boilers for #10 and #11 as funded by this "21 Campaign.")

Address

97 Cross Road
Alna, ME
04535

Alerts

Be the first to know and let us send you an email when WW&F 21 Campaign posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Our Story

With roots reaching back to 1854 but alive and kicking in the 21st Century, the Wiscasset, Waterville & Farmington Railway Museum announces its 21 Campaign. "21" represents our commitment to both restoring locomotive #10 to service and building locomotive #11, a reconstruction of original WW&F locomotive #7. The goals of today’s WW&F Railway are grandiose and plentiful - consistent with the outlook of the Wiscasset & Quebec Railroad in the mid 1800’s.