05/10/2026
Hello All,
A couple of residents asked me to enquire about the resurfacing of the main road into town. I spoke to Cllr Josie Forde about resurfacing the main Menlo road, from the crossroads over. She contacted an engineer, who in turn called Frank Fahy to arrange a visit to assess what works are needed.
The engineer visited Menlo with Frank within the last two weeks and confirmed that the road will be looked at in 2027.
I want to thank Cllr Forde
Cllr. Josie Forde for acting so quickly on this request. I'll keep you all posted on any updates I hear.
Cllr Forde has also asked that the cutting of hedges and bushes around the area be put on the schedule so you should see this being carried out soon.
Please feel free to reach out to me on anything going forward.
Thanks
Fiona