06/10/2025
🛠 Rebolt Report · October 3, 2025
On Friday, Oct 3rd, Aris Theodoropoulos and Hannes Webhofer replaced another cracked anchor ring at sector Griffig, this time on the route SAUNA AM SEE 6b+.
As a precaution, they also replaced six additional anchors on the sector’s far left, even though those anchors were not showing any signs of cracking. The new anchors use either unwelded rings (no seam) or two bolts with carabiners.
Routes with new anchors:
* 8610 3c
* USTER 4c
* LOVE SOMEONE 6b
* SAUNA AM SEE 6b+
* LEO 5a
* GLÜEWIH DELÜX 5b
* MATHIS ON THE ROAD 5c
These rings were all part of a batch of problematic welded rings prone to cracking at the seam. Following a directive by on how to identify anchor rings from this batch, Team Rebolt acted preemptively to replace them.
Before Rebolt Kalymnos, individual volunteers could realistically only respond to bolt failures and other very urgent maintenance needs. But now, thanks to your support, our team is able to carry out preventative rebolting like this, which is hugely important. Thank you for helping us keep Kalymnos safe.
⚠️ Reminder: When anchors or bolts fail, we do our best to respond immediately, but issues can still occur. Always pay attention to anchors and bolts. If an anchor looks suspect, leave two of your own carabiners (one at each bolt) for lowering, and report any issues to us so we can dispatch the team.
Special thanks to Aris and Hannes. We all feel safer in your experienced hands.
If you value this work, the best way to support it is by donating to Rebolt Kalymnos (link in bio) 💛
.
.