20/08/2026
On July 23 we shared some reflections from Ruth Blackman, our project architect – here are some more.
“The quality of stone carving and the delight of the intricate details and mouldings have been repeated in the southeast nave kneeler, the original stone having been severely damaged by a corroded metal cramp and water ingress.
With the birdcage scaffolding in the nave, the entire roof space became a carpentry workshop, over the course of three months during the summer of 2025. Timbers requiring repair were carefully labelled and dismantled and cleaned, and working with a structural engineer, and in accordance with specification, carpenters prepared and executed half lap repairs and scarf joints, and in some instances, introduced new oak sections to replace those that have been completely destroyed by deathwatch beetles.
The south principal rafter to the west truss was also dismantled, cut back to retain many of the original moulded details and repaired with an offset central timber to reinstate its integrity. Other damaged timbers, like the smaller brace, for the westernmost south intermediate principal rafter, were replaced to match the existing rebated and carved brace, replicating details that included the mortise and tenon joints to the underside of the principal rafter and the walltop cornices and ties.
Where timber repairs were likely to risk either the loss of significant historic fabric, or where removing damaged timber could potentially compromise the integrity of the original carpentry, stainless steel plates were fabricated and installed, particularly to the north and south ends of the. west tie beam.
Having completed work to the chancel roof, and the chancel and nave gables, the chancel scaffolding was struck, not only revealing the soft pastel shades of the grey green Westmoreland slates, the grey rainwater goods, the pale blue fascia boards and the rich variation in the colours to the flintwork, but, from a perch at the west end of the nave roof, the most spectacular view of the Tas valley, on a bright morning in August during one of many regular site inspections.
The passion, devotion and commitment from all those involved has become embedded in the fabric that has a permanence and resilience to ensure that the church will remain at the heart of the village for those who follow in our footsteps.”
Many thanks must go to Ruth for her dedication and hard work in making St Peter’s safe for generations to come.