Andover Model Railway Club

Andover Model Railway Club We meet at Unit 20, Chantry Centre, Andover. Hampshire. Our club night is Wednesday 7 - 10pm. We have

A great cab view of the Pendon depiction of the Midland and South West Junction Railway. The line ran from Andover to ne...
03/10/2026

A great cab view of the Pendon depiction of the Midland and South West Junction Railway. The line ran from Andover to near Cheltenham but was closed many years ago

://youtu.be/N4LmYMe5Em4?is=iKn6UcBh2VX3MMZr

Not only will you see the MSWJR line from the driver's cab but you ...

With a small grant from Test Valley Council, Hampshire CC and club funds we have been able to replace all of the old str...
02/10/2026

With a small grant from Test Valley Council, Hampshire CC and club funds we have been able to replace all of the old strip lights with energy efficient LED batons.
Wow what a difference it makes too.

Great fun today using a hot wire to shape the foam blocks into the beginnings of the cliff face. We also took the opport...
28/09/2026

Great fun today using a hot wire to shape the foam blocks into the beginnings of the cliff face. We also took the opportunity to start forming the stream which will flow into the sea.

We are holding an Open Day at our club rooms on Sat 24th October. Why not come along and see what we have to offer.
23/09/2026

We are holding an Open Day at our club rooms on Sat 24th October. Why not come along and see what we have to offer.

16/09/2026

We have reached a milestone with our N Gauge layout with a complete circuit completed. What a way to celebrate with Goldern Arrow and Pullman Set. Apologies for the usual club banter in the background.

Ballasting the new extension board is complete. Fine granite ballast, PVA diluted 50/50 with water. A few drops of washi...
13/09/2026

Ballasting the new extension board is complete. Fine granite ballast, PVA diluted 50/50 with water. A few drops of washing up liquid were added to help break the surface tension. A fine mist of water over the ballast and then PVA mix carefully applied with a syringe or dropper. This will be left to dry before weathering starts to blend it all in with existing track.

We are on to stage three - landscaping and blending the scenery with the existing boards. The foam blocks are stuck down...
13/07/2026

We are on to stage three - landscaping and blending the scenery with the existing boards. The foam blocks are stuck down with Grab adhesive and left to cure. They will be shaped using a Hot Wire cutter. Over 30C in the clubroom this morning. Rail expansion joints seem to be working --so far

29/06/2026

That's phase two completed on our O Gauge extension board - electrics complete and loco's running. now on to the ballasting !

03/06/2026

Progress continues on the extension to our O Gauge layout, Collins Cove. We have now completed and tested the new scenic board and are able to recommence running sessions. Track weathering and ballasting are next on the list.

26/05/2026

We have reached a milestone with our new N Gauge layout with the first train running today.

Address

Andover

Opening Hours

6:40pm - 9:30pm

Alerts

Be the first to know and let us send you an email when Andover Model Railway Club posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organisation

Send a message to Andover Model Railway Club:

Shortcuts

Share