SOS Save Our Shore Fremantle

SOS Save Our Shore Fremantle MRWA’s “secret” Canning Hwy diversion destroys Freo’s only river foreshore, the Containbow, cliffs and parkland. ACT NOW or it will be too late.

WEEKLY: SOS SUNDAYS 1-3pm. More actions happening. Watch this space.

🌳 🌳 🌳 🌳 🌳 https://l.facebook.com/l.php?u=https%3A%2F%2Ffremantleshippingnews.com.au%2Ffreo_today%2Fstuff-has-started%2F%...
24/03/2024

🌳 🌳 🌳 🌳 🌳
https://l.facebook.com/l.php?u=https%3A%2F%2Ffremantleshippingnews.com.au%2Ffreo_today%2Fstuff-has-started%2F%3Ffbclid%3DIwAR3HGqoVu0IAZ_p1dKfvCnyviSQ8UvrwlNuHYwZKfT9dHqo8VFYfcb5WKQY_aem_AQqdxmsiYaO-h_FW5_AxKDrr_hbkyixN1PHLWmODoxMP1yu4g7J8ZAY9r8z9fHyK-AU&h=AT1rC8mdxu1o9zZCOizYzQCJvJ5BrjzCArY6BEoQnxsGcu3YszdL3H0DMnnb2Iw4ASlUPZiCddla-AQ_cE-BGvq9NC50JCPQgRZCRLucNzAECYhFsMB-HennpbxQ&s=1

Freo Today. 24 March 2024. Stuff has started at the Old Traffic Bridge in preparation for the removal of services and eventual replacement of the Old Traffic Bridge with a new one. See our latest story Vegetation clearance and road closures about to happen on Old Traffic Bridge project. Vegetation c...

CLEARING STARTS THIS MONDAY ALONG BEACH ST AND NORTH FREO BANKS. A lot to digest here. But key is that clearing will sta...
22/03/2024

CLEARING STARTS THIS MONDAY ALONG BEACH ST AND NORTH FREO BANKS.

A lot to digest here. But key is that clearing will start this Monday, and Beaxh St will be closed from the beginning of April. More info in comments.

Is anyone able to assist us with monitoring the removal of trees?

The Fremantle Traffic Bridge houses telecommunications, gas, and water services which need to be removed from the deteriorating bridge. Development Approval was granted in October 2022 to conduct these works.

01/02/2024

Preparatory works will commence next week until end March in the form of river bed geotechnical investigations and installation of a groundwater bore on the southeastern grassed section. More info can be found here.

31/01/2024

SUBMISSIONS CLOSE TODAY
SOS friend, ex EPA and North Freo resident Charlie Nicholson has sent his submission to us. For your consideration as you prepare your own thoughts.
Link to submission in comments.

Ian is on the money.
26/01/2024

Ian is on the money.

Comment on the Development Application for the replacement for the Fremantle Traffic Bridge closes 1st February.
In my view, this proposal ticks a lot of the community boxes, with the significant exception of retention of any part of the existing traffic bridge. However, the history/heritage of the site is more than just that one artefact and I have suggested a way of recording and acknowledging that.
My comments on the DA (submitted today) are below.

The current proposal takes advantage of innovative bridge construction techniques to come very close to what the community has consistently said it wanted - like-for-like replacement of the existing traffic bridge. The main omission in this respect is any retention of any part of the existing traffic bridge.
The latest design, unlike previous ones, does contain distinctive elements (esp above the deck) which the community had sought as a distinctive 'entry statement' for Fremantle.
I have a few outstanding concerns.
First, whilst the innovative construction method substantially reduces the period of time for which there will be no active river crossing for motor vehicles, cyclists and pedestrians at this point, there is no clear indication of how the river crossing demands will be accommodated while the bridge is closed. Project consultations have been told that the remaining road system (esp Stirling Bridge) would be unable to cope with such closure.
Would it be possible, for example, to construct the cycle/pedestrian paths on one or both sides at the same time as the main lateral support structures so that these could be operational at the time the existing traffic bridge is closed and demolished?
Second, in the absence of any retention of the existing traffic bridge, the heritage/history of river crossings at this point will largely disappear. There is, however, a model (made in 1933) of the previous Bridge of Sticks, currently in the WA Maritime Museum. I suggest that a similar model be commissioned (or perhaps a competition held) for the existing traffic bridge and other previous crossings (to the same scale) to provide, in conjunction with historical display material previously produced as part of the project consultations, an historical record of the significance of the site.
Third, the artist's impressions do not clearly show river level access across Queen Victoria Street under the proposed bridge (and, ultimately, the rail bridge) on the northern side. This is important both for the longer-term, when this would be an important link between parts of North Fremantle and the redevelopment of North Quay when the container trades move to Kwinana, and to provide continuity of access across Queen Victoria Street during construction of the new bridge and its approaches.

Major update on Swan River Crossings Project. - An enhanced design for a new bridge to replace the ageing Fremantle Traf...
16/11/2023

Major update on Swan River Crossings Project.

- An enhanced design for a new bridge to replace the ageing Fremantle Traffic Bridge has today been submitted for Development Approval.

- Enhanced design was developed in response to community feedback

- Bridge will be Australia's only extradosed bridge combining both cantilevers and cable support

- Changes to road layout no longer being proposed as part of design

- Containbow art installation will now remain in its existing location

https://dpcmedia.blob.core.windows.net/publishedmediastatements/2777540_FBA_Render_4.jpg?fbclid=IwAR1cT5k8LqHLRu6xLRcuKPM3PQkKMar2OD9NUlknTUI8ToJ85B4Iq1Gspvc_aem_AWGa-xDvl5UM4GEWztpEh0DSXrtNZ-gCnxUL6OI-0O3mJgkr1P3CTvO85F1W243KqBc

The Swan River Crossings project lives on with respect to federal funding. A withdrawal of funding would have been a bet...
16/11/2023

The Swan River Crossings project lives on with respect to federal funding. A withdrawal of funding would have been a better sign…

Tomorrow: Drop-in community event to shape the future of the Fremantle Port | Inner Harbour precinct 10am-3pm @ Freo Tow...
15/07/2023

Tomorrow: Drop-in community event to shape the future of the Fremantle Port | Inner Harbour precinct 10am-3pm @ Freo Town Hall. Suitable for all.

Take your thoughts and ideas for the potential redevelopment of the Fremantle port precinct.

💚🤍💙Let’s just hope Canning Highway stays where it is and our green space is preserved, if this project raises its ugly h...
07/07/2023

💚🤍💙
Let’s just hope Canning Highway stays where it is and our green space is preserved, if this project raises its ugly head again.
🌳🌲🌳
https://www.facebook.com/100086162466967/posts/236655852549829/

Hot on the heels of my recent 'no-progress' post, and no doubt inspired by Brad Pettit's speech in Parliament (hence the $57 million headline), the Post Newspaper has this wonderful piece in today's issue (https://postnewspapers.com.au/wp-content/uploads/2023/07/08072023-lowres.pdf).
Almost exactly the same words as in the November 2022 email I have mentioned several times, but the real kicker is the statement from Project Director Ashley Vincent that: "the technical constraints of the bridge site and 'divergent feedback' from stakeholders and the community to the concept designs released in August had sent designers back to the drawing board."
In other words, Main Roads had got way ahead of themselves, failed to recognise the technical constraints that were blindingly obvious to so many in the community, and had utterly failed to bring the community along with them in the planning and design process. AND they've spent $57 million in the process, which means the budget will blow out well over the current $280 million and mean design will be pared back to a bare-minimum structure to keep costs down.
Main Roads is quoted as saying: “When all technical issues have been considered the team will prepare information for a community engagement program that allows the community to view detailed information on the project.”
WTF - Main Roads will 'graciously' allow the great unwashed of Fremantle to 'view' detailed information on the project! No consultation or involvement - just 'have a look at our latest thought bubble'.
Sounds like another exercise in tokenism that will arouse even more anger.
BUT "a commencement date for that engagement was yet to be determined", they said. We'll be keeping a close eye on things to ensure (as far as we can) that the next instalment of this seemingly-endless saga doesn't land with too much of an outrageous thud.

Address

121 Beach Street
Fremantle, WA
6160

Website

Alerts

Be the first to know and let us send you an email when SOS Save Our Shore Fremantle posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share