08/11/2026
A masonry vendor will complete repairs to the walkways in front of the pool entrance to address trip hazards and broken concrete. The steps and ramp will also be re-striped for safety. The work will begin on Wednesday, August 12th, from 5 AM to 12 noon and should be completed by Friday, August 14th. The area will be coned and taped off during the repairs. The pool will still be accessible through the sides of the entrance. Please use caution when using the pool and avoid the repair area. The tape and cones will be removed once the repaired sidewalk areas are ready for use. If you have questions, please let us know. Thank you!