SOLO DEO GLORIA: Lord, we commit all this work to You. Have mercy on those who labor, for their labor is NOT in vain. In Jesus’ name!
1. SINKS
Kitchen: Sand plywood → wipe → paint 2 coats… Install sink (clips, faucet nut, drain glue, silicone)… Clean/paint cabinet… Install slide‑out shelves.
Bathroom: Assemble faucets + drain… Connect P‑trap & water… Install sink + silicone if needed.
2. BASEBOARD CORRECTION
Remove white baseboard → install grey (save white for kitchen).
3. BEDROOM CLEANING
Remove blinds… Patch holes… Touch‑up paint… Wash windows… Dust walls/ceiling lights… Sweep… Vacuum twice… Mop with hot water.
4. FURNITURE SETUP
Wall A: Small desk… Slant‑front cabinet… Dresser… Rolling cart.
Back Wall: Install window shades + sheers… Shelf lamps… Install trapeze bars & beds… Add lamp/wall lamp… Move dresser into bathroom.
5. WALL DÉCOR / SHELVES
Side A: Install cubby… Install lamp/shelf… Butterfly shelves… Place décor items… Center marriage cross… Rolling cart… Power strip under cubby… Plug chargers… Second power strip for bed equipment.
Side B: Install shelves… Place décor items… Install cubby above desk… (Second cubby later.)
6. MOVE‑IN CRITERIA
Toilet works… Shower rods + curtains up… One sink works… Bedroom fully set up.
If shower surround done: Install hardware… Safety bars… Toilet cover + roll… New toilet seat… Squatty potty… Shower wallpaper trim.
7. WALLS, PAINT, BASEBOARDS
Bathroom/Linen: Final coat… Touch‑ups.
Kitchen Walls: Sand mud ridges… Optional leveling coat… Light sand… No texture… Paint… Paint hutch… Hang hutch + cubbies.
Refrigerators: Switch food… Clean all fridges… Move fridges… Install water line… Apply contact paper… Sort/place magnets.
8. SOUND DAMPENING WALL
Backing Layer: Remove cloth… Build cardboard cover… Hang… Staple… Trim… Add tarp.
Pink Pad Frame: Lay pads… Tape… Staple… Frame ceiling… Side panel… Decorative piece.
Center Fill: Attach pillows/cloth with tape + staples.
Clothing Roll: Roll/tape clothes… Stack/bind… Stand in corner… Tape + staples.
Bookshelves: Place towers… Install shelves… Anchor together + to wall… Replace top shelf… Add trim… Paint cardboard inserts… Install with air gap… Load books.
9. CEILINGS + HEADER
Ceilings: Clean… Tape… Mud… Sand… Paint 2 coats.
Header: Sand… Paint 3 coats.
10. DECORATIVE TOUCHES + FUTURE UPGRADES
Shoji hinges… Shower wallpaper trim… Gold tape trim… Decorative swans… Toilet paper cover stickers… Future: gold swan faucet… Possible: pink/blue shower curtain + wallpaper trim.
MOST of these tasks are DIY and or easy to learn or you've done something that gave you the right experience to be able. Someone here can show you if you are willing to give it a try. Pray, call 916-905-6814 and talk it over, find out what's left to do and arrange to come. Thank you.