ReJenerate Housing Cooperative

ReJenerate Housing Cooperative ReJenerate Housing Cooperative is Madison's newest affordable housing cooperative

It's membership season and we'd love to give you a tour of the house💛
07/17/2026

It's membership season and we'd love to give you a tour of the house💛

Madison's new ReJenerate Housing Cooperative, located on the 900 block of Jenifer Street, currently has multiple rooms and a few larger units (a 2br, 4br, and 5br) with private bath/kitchen...

Lots of work on the house since the last update. Bathroom and kitchen plumbing fixtures are all functional, cabinets are...
06/04/2025

Lots of work on the house since the last update. Bathroom and kitchen plumbing fixtures are all functional, cabinets are hung, doorknobs are installed, and more.

Interested in Joining ReJenerate?Add yourself to our prospective members list by filling out this form and we’ll contact...
05/28/2025

Interested in Joining ReJenerate?

Add yourself to our prospective members list by filling out this form and we’ll contact you when there’s an opening!

*Accessibility note: If there is a barrier to you filling out the digital form, please email us at [email protected]

***Currently there are no open rooms at ReJenerate. Please fill this form to to put yourself on the listed of interested parties to be contacted when there is an open room!*** ~~~~~~~ THIS FORM IS A WORK IN PROGRESS... just like us :) ~~~~~~~~ What is a housing co-op anyways? A co-op is a communal l...

We love compost 💩
04/16/2025

We love compost 💩

Some pictures from the past month of construction. Trim 🔨 doors 🚪 electrical ⚡️ hvac 🌬️ and more.
03/27/2025

Some pictures from the past month of construction. Trim 🔨 doors 🚪 electrical ⚡️ hvac 🌬️ and more.

Whole bunch of updates from the last week! Painting is 100% done, 🎨 flooring is mostly done,🚶‍♂️HVAC is mostly done, ♨️ ...
02/16/2025

Whole bunch of updates from the last week! Painting is 100% done, 🎨 flooring is mostly done,🚶‍♂️HVAC is mostly done, ♨️ solar is nearly done, ☀️ electrical is well on its way. 🔌

Elevator is installed. 🛗 Also, heat is on in 909! 🧡
01/31/2025

Elevator is installed. 🛗 Also, heat is on in 909! 🧡

Happy new year! 🙏 Some highlights of construction over the past couple months 🏗️ 1: New CT cabinet for the house's elect...
01/02/2025

Happy new year! 🙏 Some highlights of construction over the past couple months 🏗️ 1: New CT cabinet for the house's electrical systems. 2-3: Drywall is done! And with a nice coat of paint in a neutral color. 4: The new boiler in 909 is very close to being finished. This will allow the heating on the 909 side, including the radiant floor heating ♨️ in the basement, to be switched on. 5-6: At long last, the new 915 boiler is running! It has several new features that will allow it to run smoothly, including a new dedicated water softener. 💦

Drywall now has a first coat of mud upstairs! As HVAC nears the finish line, pipes and ductwork are now boxed out to han...
11/05/2024

Drywall now has a first coat of mud upstairs! As HVAC nears the finish line, pipes and ductwork are now boxed out to hang drywall in the basement. More updates soon 🔨🔌🪜🧰