11/08/2021
Townsend on the Park Co-owners,
Sidewalk trip hazards and repairs are scheduled to be done on Monday, November 15th weather permitting. These areas were marked with pink paint a few months ago.
If a straight line then they will be fixing the crack – trip area.
If a big “x” across the whole slab then the slab will be removed and repoured. You will not be able to walk on the cement for 3 to 5 days.
Thank you in advance for your cooperation.