23/08/2024
Recently, The D01 and D01M Packages of the Alamein Downtown Towers Project respectively completed the concrete casting of the main structure up to the 24th floor. 🏗The total height of the two towers is 207.8 meters. The construction of the main structure now exceeds 100 meters tall, laying a solid foundation to achieve the project’s perfect performance at an early stage. 🐫
To overcome the influence of uncontrollable factors such as the rainy season and sandstorms during the construction period, employees of CSCEC Egypt made scientific planning and constructed the main structure with the high speed of one floor every seven days, while ensuring quality and safety. 🌇Moreover, the cooperation between Egyptian and Chinese Employees in the design and technical departments has created conditions for the smooth progress of the design work and the effective implementation of the onsite construction. 🌞