15/06/2026
๐๐ผ๐ฐ๐๐บ๐ฒ๐ป๐๐ ๐ฎ๐ป๐ฑ ๐ฃ๐ฒ๐ฟ๐บ๐ถ๐ ๐ฅ๐ฒ๐พ๐๐ถ๐ฟ๐ฒ๐บ๐ฒ๐ป๐๐ ๐ณ๐ผ๐ฟ ๐ฆ๐ฎ๐ณ๐ฒ ๐๐ถ๐ณ๐๐ถ๐ป๐ด ๐ข๐ฝ๐ฒ๐ฟ๐ฎ๐๐ถ๐ผ๐ป๐
๐๐๐ง๐๐๐ญ๐จ๐ซ๐ฒ ๐๐จ๐๐ฎ๐ฆ๐๐ง๐ญ๐ฌ ๐๐ง๐ ๐๐ฉ๐ฉ๐ซ๐จ๐ฏ๐๐ฅ๐ฌ
๐น 1. Approved Lifting Plan
Lift plan reviewed and approved by authorized personnel.
๐น 2. Valid Permit to Work (PTW)
Relevant permit issued and valid for the lifting activity.
๐น 3. Risk Assessment / JSA
Hazards identified and control measures implemented.
๐น 4. Third-Party Crane Inspection Certificate
Current certification available and valid.
๐น 5. Third-Party Lifting Gear Certificates
Certificates available for slings, shackles, hooks, eyebolts, and other lifting accessories.
๐น 6. Crane Operator Competency Certificate
Operator trained, certified, and authorized.
๐น 7. Rigger & Banksman/Signalman Certificates
Competent personnel assigned to the lifting operation.
๐น 8. Daily Pre-Use Inspection Checklist
Crane and lifting accessories inspected before use.
๐น 9. Vehicle Roadworthiness Certificate
Required for mobile cranes operating on public roads (if applicable).
๐น 10. Underground Utility Clearance Certificate
Confirmation of no underground services within the crane setup area.
๐น 11. Barricading & Exclusion Zone Plan
Lifting area secured and access restricted.
๐น 12. Emergency Response Plan
Rescue procedures, emergency contacts, and first aid arrangements available.
๐น 13. Electrical Line Clearance Verification
Safe distance maintained from overhead power lines and utilities.
๐น 14. Site-In-Charge / Authorized Person Approval
Work approved before commencement.
๐๐๐๐ข๐ญ๐ข๐จ๐ง๐๐ฅ ๐๐๐๐๐ญ๐ฒ ๐๐๐ช๐ฎ๐ข๐ซ๐๐ฆ๐๐ง๐ญ๐ฌ
๐ธ 15. Crane Load Chart Available
Correct load capacity verified before lifting.
๐ธ 16. Ground Bearing Capacity Verification
Ground condition assessed for crane stability.
๐ธ 17. Weather Assessment
Wind speed and weather conditions checked before and during lifting.
๐ธ 18. Toolbox Talk Conducted
All crew briefed on hazards, roles, and emergency actions.
๐ธ 19. Communication System Confirmed
Standard hand signals and radio communication established.
๐ธ 20. Lifting Accessories Color Coding Verified
Inspection tags and color codes valid and visible.
๐ธ 21. Outrigger Setup Inspection
Outriggers fully extended and supported with suitable mats/pads.
๐ธ 22. Load Weight Confirmation
Actual load weight verified and within crane capacity.
๐ธ 23. PPE Compliance Check
Helmet, safety shoes, gloves, high-visibility vest, and eye protection worn.
๐ธ 24. Nearby Work Activities Reviewed
Simultaneous operations assessed to avoid conflicts.
๐ธ 25. Stop Work Authority Communicated
All workers empowered to stop unsafe lifting activities.
โ
๐
๐ข๐ง๐๐ฅ ๐๐๐ซ๐ข๐๐ข๐๐๐ญ๐ข๐จ๐ง
โ๏ธ All documents available on site
โ๏ธ All certificates valid and up to date
โ๏ธ Lift team competent and authorized
โ๏ธ Work area secured and controlled
โ๏ธ Emergency arrangements in place
โ๏ธ Authorization obtained before lifting starts