07/08/2026
Installation, Commissioning & Training of New Equipment
Fairtex Group is proud to announce the successful Installation, Commissioning, and Operator Training of our newly deployed valve testing solutions, reinforcing our commitment to engineering excellence, operational reliability, and safety.
🔹 PSV Containerised Valve Test Workshop
A fully integrated, computer-controlled mobile testing facility designed for accurate pressure safety valve testing in the field or workshop.
🔹 GGS-3100-1 High/Medium/Low Pressure Gas & Liquid SRV Test Bench
An advanced test bench engineered for precision set pressure, seat leakage, and performance testing of Safety Relief Valves in accordance with international standards.
Our commissioning process included:
✅ Equipment installation and setup
✅ System calibration and verification
✅ Functional and performance testing
✅ Operator training and hands-on demonstrations
✅ Safety, compliance, and operational best practices
At Fairtex Group, we don't just supply equipment, we ensure every system is fully commissioned, operators are confidently trained, and our clients are equipped to achieve safe, accurate, and reliable testing from day one.
Powering Safety. Ensuring Reliability. Delivering Trust.